• FESCO New Connection

    how to get fesco new connection

    How to Get a New FESCO Connection Easily

    If your utility meter is not working correctly—running too fast, stopping frequently, or completely burnt out—you may be thinking about getting a new meter installed or constantly worried about how to apply for a FESCO new connection.

    Fortunately, Faisalabad Electric Supply Company has made the entire registration process completely hassle-free and user-friendly for all its consumers. FESCO has introduced a centralized online portal system known as the ENC (Electricity New Connection) gateway.

    Whether you are moving into a fresh residential block, building a new house, expanding your commercial business layout, or opening new corporate branches in the city, this utility grid network is your single best electricity supplier. Keeping your specific consumer demands in mind, the administration allows you to safely register right from the comfort of your home or by visiting the nearest regional customer service office destination.

    Step-by-Step Guide: Online Procedure for New Connection

    Whether you are an everyday domestic household user, a commercial shop owner, an industrial factory manager, a digital business setup, or an educational institute administration, the baseline procedure for getting any category of power line tracking setup is streamlined. You can seamlessly execute your applications through both online or manual offline channels.

    You can easily obtain your active electricity meter allocation loop by strictly following the official automated grid procedures and the comprehensive step-by-step guidelines provided securely below.


    fesco application process

    Required Documents for FESCO New Connect

    o apply for a FESCO new connection safely, consumers must upload clear scanned soft copies of their identity credentials onto the ENC interface portal. Ensure that all attachments are formatted in WebP, JPG, or PDF strings and do not exceed the baseline file cap of 100 KB.

    f you face technical uploading glitches, you can securely route query tracking through the official FESCO Helpline channe🪪 CNIC Verification: Attested duplicate copies of the applicant’s valid CNIC.
    🪪 Witness Identity: Attested CNIC copies of two active local neighborhood witnesses.
    🧾 Neighboring Bill Reference: A clear copy of an active nearby household’s FESCO statement bill.
    📑 Ownership Authority: Certified registry files, property Fard allocation, or an authorized rental agreement paper.Commercial Connection Prerequisites

    Tax Registration: Valid National Tax Number (NTN) certification copy.
    📄 Business Legality: Registered commercial setup partnership deed or incorporation papers.
    Load Assessment Form: Signed load requirements sheet matching business appliance metrics.

    FESCO Online Application Steps (ENC Network Guide)

    Access Core Interface Portal: Navigate directly to the centralized Official ENC Pakistan Portal registry.
    Select Action Module: Click the Apply button positioned prominently on the top navigation bar header.
    Map Verification String: Input the 14-digit reference number of your neighbor or local witness tracking code.
    Input Connection Category Parameters: Fill out your personal names, installation billing address details, and select your power load criteria (Domestic, Commercial, Agriculture, or Industrial).
    Attach Digital Enclosures: Upload the compressed files matrix and press the final submission trigger button to download your unique application tracking reference ID token

    Uploading Guidelines for ENC Portal

    When uploading your files, ensure you provide clear scanned copies. The portal accepts documents strictly in JPG format or PDF layout, and each file size must not exceed the baseline limit of 100 KB to prevent server verification timeouts.

    How to Track Your Application Status Online

    After successful form submission, the ENC database will instantly generate a unique Tracking ID for your application. Save this token carefully. You can use this tracking string anytime on the official portal grid to check the live status of your verification progress.

    FESCO Demand Notice Payment & Meter Installation

    Once the sub-divisional officer (SDO) reviews your parameters, FESCO will issue an official Demand Notice (Challan slip). You must deposit this specified security fee at an authorized commercial bank branch.

    After payment, upload a digital snapshot of the paid receipt onto the online tracking portal. The FESCO technical installation team will visit your physical site location to active your new electricity meter loop within a few working days.

    FESCO New Connection Estimated Latency Timeline

    Connection CategorySanctioned Load LimitsOfficial Processing Timeline
    Category 1Up to 15 kW Capacity30 Operational Working Days
    Category 216 kW to 70 kW Capacity60 to 90 Operational Days
    Category 371 kW to 500 kW90+ Days (Requires Grid Inspection)

    Step-by-Step Manual Offline Application Process

    1. Visit Regional Sub-Divisional Office: Go to your nearest FESCO consumer facilitation center and collect a physical utility registration application form.
    2. Fill Out Personal Particulars: Complete the data fields carefully, including your permanent names, installation billing address coordinates, and contact strings.
    3. Attach Attested Enclosures Documents: Map all physical files, including CNIC copies of witnesses and certified property registry files.
    4. Feasibility Site Visit Check: A FESCO field inspector will visit your site perimeter to measure the precise service line wire length and audit the technical wire feasibility grid.

    Official FESCO New Connection Meter Pricing Grid (2026)

    Single-Phase Connection Price Matrix:

    • 🔹 Extended Range (41 to 100 Meters Service Line): Base fee of Rs. 9,000.
    • 🔹 Medium Range (101 to 160 Meters Service Line): Rs. 9,000 baseline tracking + Rs. 800 per extra meter above the 40-meter perimeter.
    • 🔹 Maximum Extension (Above 100 to 160 Meters Framework): Rs. 57,000 baseline fee + Rs. 1,000 per additional perimeter running meter.

    Three-Phase Connection Price Matrix:

    • 🔸 Baseline Fee Setup Tag: Standard structural allocation starts from a base of Rs. 35,000.
    • 🔸 Extended Range (41 to 100 Meters Service Line): Rs. 35,000 baseline tracking + Rs. 1,000 per subsequent running meter above the 40-meter baseline.
    • 🔸 Maximum Extension (101 to 160 Meters Perimeter): Rs. 35,000 baseline fee + Rs. 1,100 per extra perimeter installation meter.